Thatcham Municipal Lake

Posted on: 31st Dec 2006 by: Acrefield Solutions

Dual benefits

Client

West Berkshire District Council

Project Objective

To stop erosion occurring to an established island in the Discovery Centre’s two hectare lake.

Project Description

Stage 1 of this regeneration programme involved protecting the island’s shingle beach, a potential Ternary, from destructive wave action. A series of floating islands was constructed with a mixture of aquatic vegetation. Because of the lakes high duck density,protection was offered in the form of bird deterrants.

Stage 2 is now underway to eradicate the algal bloom problem altogether and preserve the lake’s resident population of carp.

Products involved

Floating islands - a single 8m x 4m metres and two 3.5m x 3.5m hexagonal islands.

Outcome

Island erosion stalled and algal problem significantly reduced.

Benefits

A superior solution with dual benefits - erosion control plus improved water quality.

Project Summary

Products Used

  • Erosion Control
  • Habitat Creation

Project Features

  • Lakes
  • Floating Islands

Project Nature

  • Turnkey
  • Medium
  • Problem Solution, Completed in 2006.

Another Water-Lines Solution

Think we can help?

Simply leave your details below and one our our team will contact you.


#BaffleCurtain installation by Water-Lines Solutions. Check out our website http://www.water-lines.co.uk for more inform… https://twitter.com/i/web/status/1070990841387327488

9 months ago

Another successful #bafflecurtain installation. https://t.co/wPpIG1hCNz

1 year ago

#bafflecurtain installation by our technicians, looking good guys, well done!! https://t.co/3sGn3pYF2B

1 year ago

The sun is shining and our technicians are busy installing #totalgasbarrier in Nottingham. If you would like to enq… https://twitter.com/i/web/status/996032976914960384

1 year ago